back

BHM - Erweiterungsbau KUBUS

The KUBUS in dialogue between old and new
Planning and execution

2006 - 2009

Architects

:mlzd Architects

Client

Bern Historical Museum

Further information

The Kubus extension, designed by architects :mlzd, was built between 2006 and 2009 and comprises storage rooms, a large exhibition hall and Classic Modernism office space. Its south-facing concrete skin impresses with its artistic, crystalline structure, while the north-facing all-glass façade reflects the palatial old building opposite. The exciting dialogue between old and new unfolds at a respectful distance. Experience the cube from the inside and gain exciting insights into the design and conceptual considerations that have shaped this iconic building.

Visits and guided tours

Type of visit: Guided tours in groups
Registration: required
Group size: maximum 25 people
Meeting point: Entrance hall of the Bernisches Historisches Museum
Guides: Claude Marbach, :mlzd Architekten and Aline Minder, Head of the BHM Programme Department

Info: The Bernisches Historisches Museum is open on Saturday and Sunday from 10 am to 5 pm. Open House Bern participants can register at the ticket office and receive a free ticket for the permanent exhibitions.

 

Directions

Various connections to "Helvetiaplatz"

Location

Helvetiaplatz 5
3006 Bern

Google Maps
Our website uses cookies

In order to optimize our website for you and to be able to continuously improve it, we use cookies. You can find more information about cookies and data protection here.