Guisanplatz 1
3014 Bern
2009: 1st place in the design competition by Aebi & Vincent Architects and the design team
2010–2013: Project planning and demolition of existing buildings, Phase 1
2014–2019: Construction of Phase 1 by Aebi & Vincent Architects
From 2018: Project planning for Phase 2
2021: Demolition of existing buildings, Phase 2
2022–2026: Construction of Phase 2 by Aebi & Vincent Architects
Federal Office for Buildings and Logistics (BBL), Bern / Federal Department of Finance
HVAC/MSRL: Enerconom AG, Bern
Electrical design: Bering AG, Bern
Security design: Siplan AG, Bern
Fire protection design: Amstein + Waltert AG, Bern
Building physics and sustainability: CSD Ingenieure AG, Liebefeld
Façade design: Prometplan AG, Brügg
Traffic planning: BSB + Partner, Engineers and Planners, Liebefeld
Signage: WBG AG, Zurich
Catering planning: HPMISTELI + Partner AG, Bern
Lighting design: Lucet GmbH, Bern
A federal administrative centre has been under construction at Guisanplatz 1 in Bern since 2013. This project website provides a detailed insight into the current construction phase, sustainability standards and their implementation.
Bringing government departments together in locations close to the city centre and with good transport links offers many advantages: short distances, optimal use of shared infrastructure and access to public transport.
The administrative centre is situated in a diverse setting between a residential neighbourhood, a football stadium, the Allmend park and the Expo site.
Phase 1 (Building A, Building B and Building 1), comprising the conversion, new construction and refurbishment of the listed building, was completed in 2019. Phase 2 involves a new building in the north of the site and is due for completion in summer 2026.
Type of tour: Guided group tours; no individual visits
Registration: Essential – entry only with valid ID (ID card, passport, driving licence, GA travelcard, or similar)
Group size: Maximum 20 people
Meeting point: After security checks in the atrium – please use the Papiermühlestrasse entrance.
Sufficient time has been allocated within the specified slot for access control, so that the tours can start on time.
Architectural tours: During the architectural
tour, the planning team explains the planning, execution and special features of this major project.
Building services tours:
During the building services tour, the building services planning team explains the approach and special features.
Saturday, 08:45-09:30 - Planning team Gebäudetechnik
Saturday, 08:45-09:30 - Planning team Generalplanung
Saturday, 09:30-10:15 - Planning team Gebäudetechnik
Saturday, 09:30-10:15 - Planning team Generalplanung
Saturday, 10:15-11:00 - Planning team Gebäudetechnik
Saturday, 10:15-11:00 - Planning team Generalplanung
Saturday, 11:00-11:45 - Planning team Gebäudetechnik
Saturday, 11:00-11:45 - Planning team Generalplanung
Tram no. 9 to "Wankdorf Center" / Bus no. 20 to "Wyler" / Publibike